You don't have javascript enabled. Good luck with that.
Pencarian
Tak Laik Jalan, Enam Kendaraan Disetop Operasi

6 Unroadworthy Vehicles in North Jakarta Controlled

North Jakarta Transportation Sub-dept had controlled 52 public transports along Jalan Kramat Jaya, Jalan Jampea Raya, Jalan RE Martadinata until Jalan Mangga Dua.

52 vehicles are made in a dossier (BAP) and six of them are stopped because do not meet the technical requirements and unroadworthy

"52 vehicles are made in a dossier (BAP) and six of them are stopped because do not meet the technical requirements and unroadworthy," said Benhard Hutajulu, Head of North Jakarta Transportation Sub-dept, Wednesday (11/9).

Of the 52 vehicles, three out of six public transports are ticketed and three out of 45 goods transports are ticketed. Then one metromini bus is ticketed.

SKPD Asked to Inventory Unroadworthy Vehicles

"We also hold lintas jaya operation at Tanjung Priok Terminal," he finished.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye923 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye627 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye600 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye589 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye548 personTiyo Surya Sakti